Our Services
Our Experience in Water Services in Ireland

With 35 years in construction in water and foul pipework Connections for one off house builds and development sites to industrial and large scale construction. Over the past few years, we have been dealing with Irish Water as a consultant and conducting civil works on a daily basis for one off houses and developments sites from Application stage to final connection. As we are a 1 stop company that deals with all Water process it takes all the time and inconvenience away.
Application prosess
Application form Housing development water and/or wastewater connection This form should be completed by a person or organisation who wishes to apply to Irish Water for a water and/ or wastewater connection to be used for a new housing development.

Complete site works

Including supply and installation of all water main works in accordance with official Irish Water specification. The Developer shall be responsible for ensuring that the Works are properly constructed in accordance with this Code of Practice. The Developer shall give at least ten working days notice to Irish Water before construction of the Works commences. He/she shall attend a Start-Up Meeting with the Irish Water Field Engineer to agree procedures for and a programme of inspections for the quality assessment of the infrastructure installations. The Developer shall keep accurate site records of the installations during construction to allow the preparation of accurate record drawings of the infrastructure installed. The Works shall be constructed strictly in accordance with the design which has been submitted by the Developer to Irish Water and which has been assessed and accepted by Irish Water
Water main Pressure testing and reports

Pressure Test Records of polyethylene pipes (if appropriate) with a hard copy printout from the data logger (in the required format) of the relaxation curve as proof of the outcome of the test. Pressure testing to Irish Water Standards ; The entire pipeline shall be pressure tested following installation of the Works on site. The pressure tests shall be conducted by the Developer’s contractor, who shall be experienced in such testing procedures, in the presence an Irish Water’s field engineer or an Irish Water agent’s supervisor. Water Mains shall be tested after they are jointed and before full backfilling commences in as far as practicable. During testing, sufficient backfilling material shall be provided above the pipe crown to resist uplift or buckling movement of the pipe and all joints shall be exposed.
Destructive Testing

The destructive weld testing and analysis shall be carried out by a specialist and accredited testing organisation who will take the samples, deliver the sample for testing, test the joint and report on the result, thus ensuring that a chain of custody is maintained on all test samples. The Developer’s contractor shall provide details of his proposed testing organisation to the Irish Water field engineer for review and approval prior to any testing being undertaken. Joint tests complying with WIS 4-32-08, (2016) shall be carried out for each pipe diameter containing electro fusion welds used by the Developer’s contractor’s personnel and welded by the equipment to be used for Works. These shall be in accordance with ISO 13954 for assembly socket fittings > 90mm, in accordance with ISO 13955.
Chlorination testing / reports


Disinfection
The Developer shall submit for approval to the Irish Water field engineer a method statement that includes drawings showing the location of the disinfectant insertion point and disinfection sampling points and which outlines the proposed methodology to be used for disinfection. Caption Pipelines shall be filled with potable water and a disinfectant inserted into the main to achieve a minimum free chlorine level of 20mg/l at the beginning of a 24 hour contact period. A maximum free chlorine level of 30mg/l shall not be exceeded at the beginning of the contact time period. Disinfection sample points shall be adjacent to the insertion point(s) and at the ends of the mains being disinfected. All pipelines shall be disinfected. This can be achieved generally using a sodium hypochlorite solution or other disinfectant subject to Irish Water approval which is suitable for drinking water disinfection. Typical products on the market contain 10 – 14% available chlorine by solution and the dose rate is dependent on the strength of the solution and the volume of water required in the Water Main.
As built survey and GPS locations
A printout of the joint details, with a GPS location of each joint;
“As-Constructed” drawings and records of the installed Works Locations of all valves, hydrants, scour valves or washout hydrants, meters, ducts, tapping locations, Water Main and service pipes, Boundary Boxes, etc., complete with legends to Irish Water’s requirements

Survey of Foul line and reports
A full survey and reports can be carried out in accordance with Irish Water requirements.

About Us
Site Works and Pipework Supply
A complete swabbing and water pressure testing programme,analysis and reports to the necessary local government and Irish Water standards.
Swabbing and Pressure Testing
A chlorine programme includes dosing the water mains, De-chlorinate the mains, taking samples for laboratory testing, analysis and reports.
Experience in Water Services
Being in the construction industry for over 35 years in all groundworks program, Amble Water Services has first hand experience in water services from application stage to connecting mains to council networks.
Complete Water Main Package
We offer a complete water main package to construction sites.We can supply a full application service to Irish Water and take the app to a complete stage.
Application Service to Irish Water
From full site works to supplying pipework including welding, photos and welding reports, destructive testing and reports to Irish Water required standards.
Our Work
Reliable – Professional – Accessible
Being in the construction industry for over 35 years in all groundworks programs I have first hand experience in water services from application stage to connecting mains to council networks.
What we offer
We offer a complete water main package to sites including
We can supply a full application service to Irish Water and take the app to a complete stage

1
From full site works
-
Supplying pipework inc welding
-
Photo and welding reports
-
Destructive testing
-
Reports to Irish Water standards
2
Testing Programme
-
A complete swabbing programme
-
A complete water pressure testing
-
Analyst to Irish Water standards
-
Reports to Irish Water standards
3
Chlorine Programme
-
Dosing the water main
-
De-chlorine the main
-
Taking samples to lab
-
Analyst and reports


Quick Links

Contacts
%20white%20background.jpg)


















